WordPress database error: [Unknown column 'insertionMethod' in 'where clause']
SELECT * FROM abmwp_xyz_ips_short_code WHERE insertionMethod = 1 AND status = 1


Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit-add-ons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /hermes/bosnacweb05/bosnacweb05ax/b392/ipg.abmadmin/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /hermes/bosnacweb05/bosnacweb05ax/b392/ipg.abmadmin/wp-includes/functions.php on line 6114
CLB The Community Bank – Lafayette Branch – Moliere Chappuis Architects – Architecture, Planning & Interior Design
Share

CLB The Community Bank – Lafayette Branch

CLB The Community Bank – Lafayette Branch

CLB The Community Bank is taking bids on September 7th, 2022 for the interior and exterior renovations on the existing building (formerly Panera Bread) at 4525 Ambassador Caffery Parkway, Lafayette, LA 70508. The work includes but not limited to the following:

  1. Earthwork and soil stabilization.
  2. Site work and grading.
  3. Onsite soil treatment.
  4. Concrete slab, piles and foundation.
  5. Steel frame structure.
  6. Fiber Cement lap siding
  7. Exterior painting
  8. Wood framing gypsum interior walls.
  9. Wood doors in hollow metal frames.
  10. Storefront exterior and interior glazing systems.
  11. Modifications to fire protection, plumbing and HVAC systems.
  12. Modifications to electrical, power and data systems & new Lighting.

The completion of this project shall be completed in 365 calendar days.

If you would like to download the files in order to bid, you must first register below:

Project was Awarded to Womack and Sons Construction Group, LLC