Our Latest News
Lafayette Police Department – Locker Room Renovations
Lafayette Consolidated Government is taking bids on September 1st, 2022 for the interior renovations to the existing locker room facilities at the Lafayette Police Department at 900 East University Avenue, Lafayette, Louisiana 70503. This project will renovate the 2 existing locker rooms to be arranged for emergency situations when PD might need to be stationed [...] Read moreCLB The Community Bank – Lafayette Branch
CLB The Community Bank is taking bids on September 7th, 2022 for the interior and exterior renovations on the existing building (formerly Panera Bread) at 4525 Ambassador Caffery Parkway, Lafayette, LA 70508. The work includes but not limited to the following: Earthwork and soil stabilization. Site work and grading. Onsite soil treatment. Concrete slab, piles [...] Read moreLCG – Lafayette Animal Shelter Breaks Ground
The Lafayette Animal Shelter and Care Center has officially broken ground. In 2019, ABM began working with Lafayette Consolidated Government to program and design a brand new no-kill animal shelter for Lafayette Parish and surrounding areas. This 20,720 sq. ft. state of the art facility consists of two separated buildings connected by two covered walkways. […]
Read moreSWLVH – Walk-In-The-Park Alzheimer’s Reflections Unit – DEAD
Louisiana Facility Planning & Control is accepting bids for the Southwest Louisiana Veterans Home Expansion of Walk-In-The-Park Alzheimer’s “Reflections” Unit. Sealed bids will be received for the State of Louisiana by the Division of Administration, Office of Facility Planning and Control, Claiborne Office Building, 1201 North Third Street, Conference Room 1-145, Post Office Box 94095, [...] Read moreLPD – Interior Renovations – Rejected
The Lafayette Police Department is taking bids on _____, ___ 2020 for the Interior Renovations and Exterior improvements of the Lafayette Police Department building on East University Avenue. This project is a renovation of the Southeastern portion of the first floor as necessary for a new administration area entrance for private parking area. The work [...] Read moreGSU Library – Awarded
Louisiana Facility Planning & Control is accepting bids for the Library Replacement at Grambling State University. Sealed bids will be received for the State of Louisiana by the Division of Administration, Office of Facility Planning and Control, Claiborne Office Building, 1201 North Third Street, Conference Room 1-145, Post Office Box 94095, Baton Rouge, Louisiana 70804-9095 [...] Read moreLibrary Design Unveiled – Grambling State University
The final design (with some minor tweaks) from the Design Development process is now public. This 50,000 square foot, state of the art library facility will serve a student body of over 5,200 students. The building comes with over 17,000 square feet of dedicated study spaces, over 500 student computer stations, 5,000 square feet of [...] Read moreComeaux High PAA – Ribbon Cutting
The Ovey Comeaux High School Performing Arts Academy building is finally complete after 9 months of construction and $6.4 million in construction cost. This 21,000 square foot Building consist of multiple classrooms, a dance room with sprung floor, a black box theater complete with catwalk and full audio and video capabilities, and other support spaces […]
Read more