WordPress database error: [Unknown column 'insertionMethod' in 'where clause']
SELECT * FROM abmwp_xyz_ips_short_code WHERE insertionMethod = 1 AND status = 1


Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit-add-ons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /hermes/bosnacweb05/bosnacweb05ax/b392/ipg.abmadmin/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the monolit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /hermes/bosnacweb05/bosnacweb05ax/b392/ipg.abmadmin/wp-includes/functions.php on line 6114
Oak Center Development – Moliere Chappuis Architects – Architecture, Planning & Interior Design
Share

Oak Center Development

Oak Center Development

Architects Beazley Moliere is taking bids on behalf of M Properties LLC on September 19th, 2022 for the new construction of multiple buildings at 1206 E Broussard Road, Lafayette, Louisiana 70508.

The Work of Project is defined by the Contract Documents and includes the earthwork and site work associated with Oak Center Development and consist of the following:

  1. Earthwork and soil stabilization.
  2. Site work and grading.
  3. Onsite soil treatment.
  4. Concrete slab, piles and foundation.
  5. Preformed Metal Building Structure.
  6. Stucco and applied stone veneer exterior walls.
  7. Concrete masonry exterior and interior walls.
  8. Wood doors in hollow metal frames.
  9. Storefront exterior and interior glazing systems.
  10. Light gauge metal framing and gypsum board wall systems.
  11. New plumbing and HVAC systems.
  12. New electrical lighting and power system

The completion of this project shall be completed in 365 calendar days.

If you would like to download the files in order to bid, you must first register below:

[download id=”4377″]

[download id=”4376″]

[download id=”4486″]

[download id=”4650″]

[download id=”4710″]

Share post:

Leave A Comment

You must be logged in to post a comment.